skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Innovative production system goes in off Ivory Coast

Journal Article · · Oil and Gas Journal
OSTI ID:80145
 [1];  [2]
  1. Oceaneering Production Systems, Houston, TX (United States)
  2. Paragon Engineering Services Inc., Houston, TX (United States)

The phased field development of the Lion and Panthere fields, offshore the Ivory Coast, includes a small floating production, storage, and offloading (FPSO) tanker with minimal processing capability as an early oil production system (EPS). For the long-term production scheme, the FPSO will be replaced by a converted jack up mobile offshore production system (MOPS) with full process equipment. The development also includes guyed-caisson well platforms, pipeline export for natural gas to fuel an onshore power plant, and a floating storage and offloading (FSO) tanker for oil export. Pipeline export for oil is a future possibility. This array of innovative strategies and techniques seldom has been brought together in a single project. The paper describes the development plan, early oil, jack up MOPS, and transport and installation.

OSTI ID:
80145
Journal Information:
Oil and Gas Journal, Vol. 93, Issue 29; Other Information: PBD: 17 Jul 1995
Country of Publication:
United States
Language:
English

Similar Records

An innovative fast-track development for Cote d`Ivoire
Conference · Tue Dec 31 00:00:00 EST 1996 · OSTI ID:80145

Barracuda field: New records for turret moored FPSO`s
Conference · Fri Dec 01 00:00:00 EST 1995 · OSTI ID:80145

Design of early production metering needs system approach
Journal Article · Mon Mar 24 00:00:00 EST 1986 · Oil Gas J.; (United States) · OSTI ID:80145