Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status and Future Plans of the PEP-II B-Factory

Technical Report ·
DOI:https://doi.org/10.2172/800069· OSTI ID:800069

The PEP-II e+e- collider [1,2,3,4] has been operating for two years with the BaBar detector at the energy of the Upsilon 4S resonance. The peak luminosity has reached 3.3 x 10{sup 33}/cm{sup 2}/s with 693 bunches with a positron current of 1.5 A and an electron current of 0.8 A. PEP-II has delivered in excess of 38 fb{sup -1} of data to BaBar. The beam-beam tune shift limits are approaching 0.05-0.07 horizontally and 0.03-0.05 vertically [5]. The electron cloud instability ECI enlarges the positron beam size at high currents but is reduced by a solenoidal field on the vacuum chambers [6]. The beam currents in PEP-II are being raised to increase the number of bunches and the luminosity. Over the next few years the luminosity goal for PEP-II is 10{sup 34}/cm{sup 2}/s.

Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
800069
Report Number(s):
SLAC-PUB-9451
Country of Publication:
United States
Language:
English

Similar Records

Performance of the PEP-II B-Factory Collider at SLAC
Conference · Thu Mar 02 23:00:00 EST 2006 · OSTI ID:877216

Progress of the PEP-II-B-factory
Conference · Sun Jun 01 00:00:00 EDT 2003 · OSTI ID:842976

PROGRESS OF THE PEP-II B-FACTORY
Technical Report · Thu Dec 04 23:00:00 EST 2003 · OSTI ID:826592