Engineering Task Plan for Routine Engineering Support for Core Sampler System
- COGEMA
Routine engineering support is required during normal operation of the core sampler trucks and associated ancillary equipment. This engineering support consists of, but is not limited to, troubleshooting operation problems, correcting minor design problems, assistance with work package preparation, assistance with procurement, fabrication shop support, planning of engineering tasks and preparation of associated Engineering Task Plans (ETP) and Engineering Service Requests (ESR). This ETP is the management plan document for implementing routine engineering support. Any additional changes to the scope of this ETP shall require a Letter of Instruction from Lockheed Martin Hanford Corp (LMHC). This document will also be the Work Planning Document for Development Control (HNF 1999a). The scope of this task will be to provide routine engineering support for Characterization equipment as required to support Characterization Operations. A task by task decision will be made by management to determine which tasks will be done per this ETP and if additional ETPs and/or ESRs are required. Due to the unique nature of this task, the only identifiable deliverable is to provide support as requested. Deliverables will be recorded in a task logbook as activities are identified. ESRs will be generated for tasks that require more than 40 person hours to complete, per Characterization Engineering Desk Instructions (DI 1999a).
- Research Organization:
- COGEMA (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 798851
- Report Number(s):
- HNF-SD-WM-ETP-220, Rev.1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
Implementation plan for HANDI 2000 TWRS master equipment list
N2 vs H20 as purge/hydrostatic head
Technical Report
·
Thu Jun 24 00:00:00 EDT 1999
·
OSTI ID:782391
Implementation plan for HANDI 2000 TWRS master equipment list
Technical Report
·
Wed Mar 24 23:00:00 EST 1999
·
OSTI ID:781600
N2 vs H20 as purge/hydrostatic head
Technical Report
·
Wed Mar 20 23:00:00 EST 1996
·
OSTI ID:483496