N2 vs H20 as purge/hydrostatic head
This document provides the information to explain to the customer the ETP for the N2 vs H20 as Purge/Hydrostatic Head. This ETP follows the format described in Issurance of New Characterization Equipment Engineering Desk Instructions, 75200-95-013.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 483496
- Report Number(s):
- WHC-SD-WM-ETP--191; ON: DE97052789
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineering Task Plan for Routine Engineering Support for Core Sampler System
Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
Engineering task plan for purged light system
Technical Report
·
Sun Dec 05 23:00:00 EST 1999
·
OSTI ID:798851
Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
Technical Report
·
Thu Jun 24 00:00:00 EDT 1999
·
OSTI ID:782391
Engineering task plan for purged light system
Technical Report
·
Tue May 11 00:00:00 EDT 1999
·
OSTI ID:782287