Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Interface Control Document Between the Double Shell Tanks (DST) System and the Plutonium Finishing Plan (PFP)

Technical Report ·
DOI:https://doi.org/10.2172/798654· OSTI ID:798654
This document identifies the requirements and responsibilities for all parties to support waste transfer from the Plutonium Finishing Plant (PFP) facility to the Double-Shell Tank (DST) System of the River Protection Project (RPP). This Interface Control Document (ICD) will not attempt to control the physical portion of this interface because the physical equipment making up this interface, and any associated interface requirements, are already in place, operational and governed by existing operating specifications and other documentation. The PFP and DST Systems have a direct physical interface (the waste transfer pipeline) that travels between the 241-2 Building (TK-D5) and DST SY-102 via 244-TX double-contained receiver tank (DCRT). The purpose of the ICD process is to formalize working agreements between the RPP DST System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST System to support the Phase I Privatization effort.
Research Organization:
LMHC (US)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
798654
Report Number(s):
HNF-4486, Rev.0
Country of Publication:
United States
Language:
English