Functional design criteria for pumping and instrumentation control (PIC) skids

Technical Report ·
DOI:https://doi.org/10.2172/797703· OSTI ID:797703
Radioactive liquid and semisolid waste from operation of Hanford's nuclear fuel processing plants is stored in 177 underground storage tanks located in the 200 Areas of the Hanford site. 28 of these tanks are of double-shell construction. The remaining 149 tanks are of single-shell construction. Only the newer, double-shell tanks (DST) can meet current requirements for containment of dangerous waste. Therefore, the single-shell tanks (SST) are being ''interim stabilized,'' which is the process of removing liquid from the waste through the use of a jet pump installed in a saltwell which penetrates the waste. Lockheed Martin Hanford Company has decided to purchase additional Pumping and Instrumentation Control (PIC) skids to monitor and control the operation of saltwell jet pumps in SSTs. Similar PIC skids are already in use at several locations. The PIC skids will shut off all power to equipment/instruments if preset limits are exceeded for such conditions as flammable gas, leak detection, pressure and flow, as well as provide air and water necessary for saltwell pumping activities. This document outlines the functional design criteria for pumping and instrumentation control (PIC) skids to support the interim stabilization effort for saltwell pumping.
Research Organization:
LMHC (US)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
797703
Report Number(s):
HNF-4481, Rev.0
Country of Publication:
United States
Language:
English

Similar Records

Hanford Waste Physical and Rheological Properties: Data and Gaps
Technical Report · Mon Aug 01 00:00:00 EDT 2011 · OSTI ID:1025093

ATR for the A-101 pumping and instrumentation control skid
Technical Report · Mon Jun 10 00:00:00 EDT 1996 · OSTI ID:662085

Single-shell tank interim stabilization project plan
Technical Report · Thu Mar 26 23:00:00 EST 1998 · OSTI ID:353277