skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: ATR for the A-101 pumping and instrumentation control skid

Abstract

This Acceptance Test Report presents the results of the acceptance test performed at the vendor shop on the monitors and control functions of the A-101 Saltwell Pumping PICS skid. This work supports the interim stabilization of tank 241-A-101.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
662085
Report Number(s):
WHC-SD-WM-ATR-170
ON: DE98054286; BR: EW3120071; TRN: 96000468
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 10 Jun 1996
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; CONTROL SYSTEMS; MONITORING; PERFORMANCE TESTING; PUMPS; TANKS; WASTES

Citation Formats

Kujak, S.K. ATR for the A-101 pumping and instrumentation control skid. United States: N. p., 1996. Web. doi:10.2172/662085.
Kujak, S.K. ATR for the A-101 pumping and instrumentation control skid. United States. doi:10.2172/662085.
Kujak, S.K. Mon . "ATR for the A-101 pumping and instrumentation control skid". United States. doi:10.2172/662085. https://www.osti.gov/servlets/purl/662085.
@article{osti_662085,
title = {ATR for the A-101 pumping and instrumentation control skid},
author = {Kujak, S.K.},
abstractNote = {This Acceptance Test Report presents the results of the acceptance test performed at the vendor shop on the monitors and control functions of the A-101 Saltwell Pumping PICS skid. This work supports the interim stabilization of tank 241-A-101.},
doi = {10.2172/662085},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jun 10 00:00:00 EDT 1996},
month = {Mon Jun 10 00:00:00 EDT 1996}
}

Technical Report:

Save / Share: