Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use
- TRS
This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.
- Research Organization:
- TRS (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 797552
- Report Number(s):
- HNF-SD-W314-ABU-002, Rev.2
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-314 241-AN-B valve pit upgrade acceptance for beneficial use
Project W-314 az-02a pump pit upgrade acceptance for beneficial use
Project W-314 specific test and evaluation plan for 241-A-B valve pit upgrade
Technical Report
·
Wed Jul 21 00:00:00 EDT 1999
·
OSTI ID:797553
Project W-314 az-02a pump pit upgrade acceptance for beneficial use
Technical Report
·
Mon Sep 29 00:00:00 EDT 1997
·
OSTI ID:327593
Project W-314 specific test and evaluation plan for 241-A-B valve pit upgrade
Technical Report
·
Thu Mar 19 23:00:00 EST 1998
·
OSTI ID:10154168