Impact evaluation of a slush stock chest bypass installed at Scott Paper Company under the energy $avings plan
This impact evaluation of the bypass of a slush stock chest that was recently installed at Scott Paper Company (Scott Paper) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The project consists of installing an adjustable speed drive, a 74.6 kW (100 hp) pump, a re-sized impeller, and piping modifications to bypass the slush stock chest and related equipment. The objective of this impact evaluation was to assess how much electrical energy is being saved at Scott Paper as a result of the E$P and to determine how much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Scott Paper`s proposal and completion report). Based on this impact evaluation, energy savings from this project are expected to be 763,600 kilowatt-hours/year (kWh/yr) or 0.087 average megawatts (aMW). On a per-ton basis, this project will save 4.64 kWh/ton or 39.2%. The project cost $120,098 to install, and Scott Paper received payment of $82,232 (in 1993 dollars) from Bonneville for the acquisition of energy savings. Pacific Northwest Laboratory calculated the real levelized cost of the energy savings to Bonneville as 14.2 mills/kWh (in 1993 dollars) over the project`s assumed 15-year life, and the real levelized cost to the region as 21.9 mills/kWh, not including transmission and distribution effects. The project would not have been implemented without the acquisition payment from Bonneville and therefore is not a free rider.
- Research Organization:
- Pacific Northwest Lab., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 79063
- Report Number(s):
- PNL--9466; ON: DE95012396
- Country of Publication:
- United States
- Language:
- English
Similar Records
Impact evaluation of a refrigeration control system installed at Columbia Colstor
Impact evaluation of an induction furnace replacement under the Energy $avings Plan at Mackenzie Specialty Castings, Incorporated
Impact evaluation of a refrigeration control system installed at Vitamilk Dairy, Incorporated under the Energy $avings Plan
Technical Report
·
Sun Dec 31 23:00:00 EST 1995
·
OSTI ID:208394
Impact evaluation of an induction furnace replacement under the Energy $avings Plan at Mackenzie Specialty Castings, Incorporated
Technical Report
·
Thu Mar 31 23:00:00 EST 1994
·
OSTI ID:10159861
Impact evaluation of a refrigeration control system installed at Vitamilk Dairy, Incorporated under the Energy $avings Plan
Technical Report
·
Sat Dec 31 23:00:00 EST 1994
·
OSTI ID:50901