Recently, the Low-Energy Demonstration Accelerator (LEDA) portion of the Accelerator Production of Tritium (APT) project reached its 100-mA, 8-hr CW beam operation milestone. LEDA consists of a 75-keV proton injector, 6.7-MeV, 350-MHz CW radio-frequency quadruple (RFQ) with associated high-power and low-level rf systems, a short high-energy beam transport (HEBT) and high-power (670-kW CW) beam dump. During the commissioning phase it was discovered that the RFQ field level needs to be approximately 5-10% higher than design in order to accelerate the full 100-mA beam with low losses. Upon further investigation, we have observed that the beam transmission for the 100-mA low-duty-factor beam is unexpectedly low for RFQ field levels between 90 and 105% of design. This paper will describe some aspects of LEDA operations critical to achieving the above milestone. Measurement and simulation results focused on understanding this reduced beam transmission for the RFQ operating at design conditions are also presented.

Research Organization:
Los Alamos National Lab., NM (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
768253
Report Number(s):
LA-UR-00-3742
Country of Publication:
United States
Language:
English

Similar Records

HIGH POWER OPERATIONS AT THE LOW ENERGY DEMONSTRATION ACCELERATOR (LEDA)
Conference · Sun Dec 31 23:00:00 EST 2000 · OSTI ID:773885

OPERATIONS OF THE LEDA RESONANTLY COUPLED RFQ
Conference · Sat Mar 31 23:00:00 EST 2001 · OSTI ID:782792

Progress update on the low-energy demonstration accelerator (LEDA)
Conference · Sun Jun 01 00:00:00 EDT 1997 · OSTI ID:486168