Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RF Control Requirements for the CEBAF Energy Upgrade Cavities

Conference ·
OSTI ID:766466
The 6 GeV CEBAF accelerator at Jefferson Lab is arranged in a five-pass racetrack configuration, with two superconducting radio frequency (SRF) linacs joined by independent magnet transport arcs. It is planned to increase the accelerator energy to eventually support 12 GeV operations. To achieve this, a new 7-cell superconducting cavity is being built to operate at an average accelerating gradient of 12.5 MV/m with an external Q of 2.2 x 10{sup 7}. The present RF system, composed of an analog control loop driving a 5 kW klystron, will not easily support the narrower bandwidth cavities at the higher gradients. A new RF control system that may incorporate digital feedback, driving an 8 kW klystron is being proposed. In designing a system it is important to understand the control limitations imposed by the cavity, such as microphonics, Lorentz force detuning and turn-on transients. This paper discusses these limitations and the resulting design constraints for new RF controls.
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
766466
Report Number(s):
JLAB-ACE-00-01; DOE/ER/40150-1766
Country of Publication:
United States
Language:
English

Similar Records

RF System Modeling for the CEBAF Energy Upgrade
Conference · Fri May 01 00:00:00 EDT 2009 · OSTI ID:1021846

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES
Conference · Sun Jul 01 00:00:00 EDT 2012 · OSTI ID:1047737

CEBAF RF separator system
Conference · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:756683