COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES
Conference
·
OSTI ID:1047737
The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- AC05-06OR23177
- OSTI ID:
- 1047737
- Report Number(s):
- JLAB-ACE-12-1569; DOE/OR/23177-2172
- Country of Publication:
- United States
- Language:
- English
Similar Records
OPERATION OF THE CEBAF 100 MV CRYOMODULES
Operational experience with CW high gradient and high QL cryomodules
CEBAF SRF Performance during Initial 12 GeV Commissioning
Conference
·
Mon May 01 00:00:00 EDT 2017
·
OSTI ID:1968422
Operational experience with CW high gradient and high QL cryomodules
Conference
·
Sun Nov 30 23:00:00 EST 2014
·
OSTI ID:1189922
CEBAF SRF Performance during Initial 12 GeV Commissioning
Conference
·
Tue Sep 01 00:00:00 EDT 2015
·
OSTI ID:1223471