Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status of PEP-II and BABAR

Technical Report ·
DOI:https://doi.org/10.2172/763789· OSTI ID:763789

In this report, the status of the PEP-II machine and the BaBar detector are presented. Performance is presented as of the Lepton Photon Conference (August 1999) with subsequent performance levels footnoted as appropriate. This report is made on behalf of the SLAC/LBNL/LLNL team that built and commissioned PEP-II, the SLAC Accelerator Department that commissioned and operated the machine, and the 71 institution, 9 nation detector collaboration that built, commissioned, and operate BaBar.

Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
763789
Report Number(s):
SLAC-PUB-8459
Country of Publication:
United States
Language:
English

Similar Records

The First Year of the BABAR Experiment at PEP-II
Technical Report · Sun Dec 17 23:00:00 EST 2000 · OSTI ID:784776

The First Year of the BABAR Experiment at PEP-II
Technical Report · Sun Dec 17 23:00:00 EST 2000 · OSTI ID:784806

LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
Technical Report · Thu May 01 00:00:00 EDT 2003 · OSTI ID:813055