Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

(Shippingport Atomic Power Station). Quarterly operating report, second quarter 1976

Technical Report ·
DOI:https://doi.org/10.2172/7317975· OSTI ID:7317975
During the second quarter of 1976, the Shippingport Atomic Power Station remained shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) core conversion. The PWR Core has been removed from the reactor vessel and remains in storage in the deep pit of the Fuel Handling Canal. At the beginning of the second quarter, the 1D reactor coolant loop was isolated from the reactor vessel, filled and on head tank pressure. The 1C reactor coolant loop was isolated from the reactor and drained for 1C Main Coolant Pump removal. The 1A and 1B reactor coolant loops were open to the reactor vessel. The pressurizer was open to the reactor vessel.
Research Organization:
Duquesne Light Co., Shippingport, PA (USA)
OSTI ID:
7317975
Report Number(s):
DLCS-5000276
Country of Publication:
United States
Language:
English