Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

(Shippingport Atomic Power Station). Quarterly operating report, third quarter 1976

Technical Report ·
DOI:https://doi.org/10.2172/7302776· OSTI ID:7302776
During the third quarter of 1976, the Shippingport Atomic Power Station remained shutdown of PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) core conversion. The PWR Core has been removed from the reactor vessel and remains in storage in the deep pit of the Fuel Handling Canal. The LWBR core barrel has been installed in the reactor vessel. At the beginning of the quarter the 1A, 1B, 1C and 1D reactor coolant loops were drained with a nitrogen purge established. The 1B, 1C and 1D steam generators were in a wet lay-up condition and recirculating on the reactor plant cooldown and temperature control heat exchanger. The 1A steam generator was in a partial drain condition with a nitrogen purge established. The pressurizer was drained and isolated from the reactor vessel. The preceding plant conditions remained the same throughout the third quarter. The reactor vessel water level was maintained between 706'0'' and 699'6''.
Research Organization:
Duquesne Light Co., Shippingport, PA (USA)
OSTI ID:
7302776
Report Number(s):
DLCS-5000376
Country of Publication:
United States
Language:
English