Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Chronology of the beryllium-replacement shutdown at the High Flux Isotope Reactor

Technical Report ·
DOI:https://doi.org/10.2172/7315526· OSTI ID:7315526
A description of the HFIR reactor is presented together with a detailed analysis of activities related to the replacement of the permanent beryllium reflector. (DG)
Research Organization:
Oak Ridge National Lab., TN (USA)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
7315526
Report Number(s):
ORNL/TM-5402
Country of Publication:
United States
Language:
English