Plutonium assemblies in reload 1 of the Dodewaard Reactor
Journal Article
·
· Nucl. Technol.; (United States)
OSTI ID:7294468
- Belgonucleaire, Brussels
Since 1963, Belgonucleaire has been developing the design of plutonium assemblies of the island type (i.e., plutonium rods inserted in the control zone of the assembly and enriched uranium rods at the periphery) for light water reactors. The application to boiling water reactors (BWRs) led to the introduction, in April 1971, of two prototype plutonium island assemblies in the Dodewaard BWR (The Netherlands): Those assemblies incorporating plutonium in 42 percent of the rods are interchangeable with standard uranium assemblies of the same reload. Their design, which had to meet these criteria, was performed using the routine order in use at Belgonucleaire; experimental checks included a mock-up configuration simulated in the VENUS critical facility at Mol and open-vessel cold critical experiments performed in the Dodewaard core. The pelleted plutonium rods were fabricated and controlled by Belgonucleaire following the manufacturing procedures developed at the production plant. In one of the assemblies, three vibrated plutonium fuel rods with a lower fuel density were introduced in the three most highly rated positions to reduce the power rating. Those plutonium assemblies experienced peak pellet ratings up to 535 W/cm and were discharged in April 1974 after having reached a mean burnup of approximately 21,000 MWd/MT. In-core instrumentation during operation, visual examinations, and reactivity substitution experiments during reactor shutdown did not indicate any special feature for those assemblies compared to the standard uranium assemblies, thereby demonstrating their interchangeability.
- OSTI ID:
- 7294468
- Journal Information:
- Nucl. Technol.; (United States), Journal Name: Nucl. Technol.; (United States) Vol. 33:2; ISSN NUTYB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Plutonium assemblies in the Dodewaard BWR
Experience in PWR and BWR mixed-oxide fuel management
Mixed Reload Design Using MOX and UOX Fuel Assemblies
Technical Report
·
Sun Dec 31 23:00:00 EST 1972
·
OSTI ID:4333986
Experience in PWR and BWR mixed-oxide fuel management
Journal Article
·
Wed Mar 31 23:00:00 EST 1993
· Nuclear Technology; (United States)
·
OSTI ID:6802906
Mixed Reload Design Using MOX and UOX Fuel Assemblies
Conference
·
Mon Jul 01 00:00:00 EDT 2002
·
OSTI ID:21064626
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
BWR TYPE REACTORS
DESIGN
DODEWAARD REACTOR
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL CYCLE
FUEL ELEMENTS
PERFORMANCE
PLUTONIUM RECYCLE
POWER REACTORS
REACTOR COMPONENTS
REACTOR FUELING
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
BWR TYPE REACTORS
DESIGN
DODEWAARD REACTOR
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL CYCLE
FUEL ELEMENTS
PERFORMANCE
PLUTONIUM RECYCLE
POWER REACTORS
REACTOR COMPONENTS
REACTOR FUELING
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS