Fatigue life evaluation of connections between the HTGR thermal barrier attachment fixtures and the PCRV liner
The results of a development program to evaluate the fatigue life of the welded stud connections between the HTGR thermal barrier attachment fixtures and the prestressed concrete reactor vessel (PCRV) liner are presented. The corrective actions taken to remedy the problems disclosed by this program are also described.
- Research Organization:
- General Atomic Co., San Diego, CA (USA)
- DOE Contract Number:
- EY-76-C-03-0167-050
- OSTI ID:
- 7290611
- Report Number(s):
- GA-A-14040
- Country of Publication:
- United States
- Language:
- English
Similar Records
Anchor stud monotonic and cyclic shear tests. Final report. [PCRV liner studs]
Cooling tubes: monotonic and cyclic shear tests. Final report. [HTGR]
Prestressed-concrete reactor vessel (PCRV) design-concept study for small HTGR steam-cycle plant
Technical Report
·
Sun Jul 01 00:00:00 EDT 1979
·
OSTI ID:6114232
Cooling tubes: monotonic and cyclic shear tests. Final report. [HTGR]
Technical Report
·
Sun Jul 01 00:00:00 EDT 1979
·
OSTI ID:5904153
Prestressed-concrete reactor vessel (PCRV) design-concept study for small HTGR steam-cycle plant
Conference
·
Mon Jan 31 23:00:00 EST 1983
·
OSTI ID:6119094