MHD Integrated Topping Cycle Project

Technical Report ·
DOI:https://doi.org/10.2172/7238658· OSTI ID:7238658
The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.
Research Organization:
TRW Space and Technology Group, Redondo Beach, CA (United States). Applied Technology Div.
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC22-87PC90274
OSTI ID:
7238658
Report Number(s):
DOE/PC/90274-T18; MHD-ITC--92-001; ON: DE92018087
Country of Publication:
United States
Language:
English