MHD contractors` review meeting: Abstracts
Conference
·
OSTI ID:10142247
The objectives of the Integrated Topping Cycle project are to design, construct, and deliver all prototypical hardware necessary to conduct long duration integrated MHD topping cycle proof-of-concept tests at the Component Development and Integration Facility (CDIF) in Butte, Montana. The results of the long duration tests will augment the existing engineering data base on MHD power train reliability, maintainability, durability, and performance, and will serve as a basis for scaling up to the early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include the following: A slagging coal combustion subsystem with a rated capacity of 50 MW thermal input, capable of operation with eastern (Illinois {number_sign}6) or western (Montana Rosebud) coal. A channel subsystem consisting of a segmented supersonic nozzle, channel (with current controls), and diffuser, capable of power output of 1.5 MW{sub e}. A current consolidation subsystem to interface the channel with the existing facility inverter.
- Research Organization:
- USDOE Pittsburgh Energy Technology Center, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 10142247
- Report Number(s):
- CONF-9201102--Absts.; ON: DE92011549; NC: NONE
- Country of Publication:
- United States
- Language:
- English
Similar Records
MHD contractors' review meeting: Abstracts
MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990
MHD Integrated Topping Cycle Project
Conference
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:5392439
MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990
Technical Report
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:10163495
MHD Integrated Topping Cycle Project
Technical Report
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:7238658