Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

MC3714 Thermal Battery Lot 01 Tool Made Sample failure and corrective action

Technical Report ·
OSTI ID:719595
As part of the determination of a products conformance to design definition, as defined in the product specification, and the capability of the production facility to produce product of the required quantity and quality, as determined by facilities equipment processes and controls, a Tool Made Sample (TMS) is required. TMS is evaluated under the direction of Sandia National Laboratories, Albuquerque (SNLA), and verifies that the performance of the product meets design requirements. Production of product is authorized with an acceptable Qualification Evaluation Release (QER). This report describes the TMS failure which occurred when testing the MC3714 Thermal Battery Part No. 318936-00, at GE Neutron Devices (GEND) during the week of October 17, 1988, and the subsequent evaluation program leading to a design change and an acceptable TMS the week of December 5, 1988. 19 figs., 6 tabs.
Research Organization:
General Electric Co., Largo, FL (United States). Neutron Devices Dept.
DOE Contract Number:
AC04-76DP00656
OSTI ID:
719595
Report Number(s):
GEPP-TM--1164; ON: TI89020696
Country of Publication:
United States
Language:
English

Similar Records

Failure analysis of prototype optoelectronic trigger assembly
Technical Report · Wed Jul 05 00:00:00 EDT 1989 · OSTI ID:10156413

JOWOG 39 manufacturing technology, Fourth annual SUBWOG-F robotics meeting minutes
Conference · Wed Oct 31 23:00:00 EST 1990 · OSTI ID:721020

CADCAM integration: test data and product definition data exchange. Pilot project Nos. 4 and 5
Technical Report · Wed Jun 19 00:00:00 EDT 1985 · OSTI ID:5524475