Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Station blackout with reactor coolant pump seal leakage

Conference · · Transactions of the American Nuclear Society; (United States)
OSTI ID:7129035
 [1]
  1. Southern California Edison, Irvine, CA (United States)

The U.S. Nuclear Regulatory Commission (NRC) amended its regulations in 10CFR50 with the addition of a new section, 50.63, [open quotes]Loss of All Alternating Current Power.[close quotes] The objective of these requirements is to ensure that all nuclear plants have the capability to withstand a station blackout (SBO) and maintain adequate reactor core cooling and containment integrity for a specified period of time. The NRC also issued Regulatory Guide (RG) 1.155, [open quotes]Station Blackout,[close quotes] to provide guidance for meeting the requirements of 10CFR50.63. Concurrent with RG-1.155, the Nuclear Utility Management and Resources Council (NUMARC) has developed NUMARC 87-00 to address SBO-coping duration and capabilities at light water reactors. Licensees are required to submit a topical report based on NUMARC 87-00 guidelines, to demonstrate compliance with the SBO rule. One of the key compliance criteria is the ability of the plant to maintain adequate reactor coolant system (RCS) inventory to ensure core cooling for the required coping duration, assuming a leak rate of 25 gal/min per reactor coolant pump (RCP) seal in addition to technical specification (TS) leak rate.

OSTI ID:
7129035
Report Number(s):
CONF-931160--
Journal Information:
Transactions of the American Nuclear Society; (United States), Journal Name: Transactions of the American Nuclear Society; (United States) Vol. 69; ISSN 0003-018X; ISSN TANSAO
Country of Publication:
United States
Language:
English