Master environmental control and mine system design simulator for underground coal mining. Volume VI. Production subsystem. Final report
Technical Report
·
OSTI ID:7117595
This report is volume 6 of an 11-volume report on a dynamic general purpose computer simulation model for underground coal mining. This volume describes the production subsystem of the Master Design Simulator. This subsystem provides the means for moving the model through time on a computer and recording its behavior. The logic of the production subsystem can accommodate multiple face units and both standard and nonstandard activities in each mining section. Each activity is assigned a specific and separate list of instructions for the simulation. These instructions include determination of tramming paths, wait and change point locations, entry and cut locations, as well as commands to advance in the mining cycle and tram. Advancing through the mining cycle is handled through a sequential execution of a subset of face jobs that is predetermined in the program logic. A case study is presented illustrating the application of the model as a free-standing program. The appendices comprise a user's manual for the subsystem, and include a program listing. (GRA)
- Research Organization:
- Pennsylvania State Univ., University Park (USA). Coll. of Earth and Mineral Sciences
- OSTI ID:
- 7117595
- Report Number(s):
- PB-255426
- Country of Publication:
- United States
- Language:
- English
Similar Records
Master environmental control and mine system design simulator for underground coal mining. Volume V. Subsidence subsystem. Final report
Master environmental control and mine system design simulator for underground coal mining. Volume VII. Rail haulage subsystem. Final report
Master environmental control and mine system design simulator for underground coal mining. Volume XI. Total systems application. Final report
Technical Report
·
Sun Jun 30 00:00:00 EDT 1974
·
OSTI ID:7223787
Master environmental control and mine system design simulator for underground coal mining. Volume VII. Rail haulage subsystem. Final report
Technical Report
·
Sun Jun 30 00:00:00 EDT 1974
·
OSTI ID:7308220
Master environmental control and mine system design simulator for underground coal mining. Volume XI. Total systems application. Final report
Technical Report
·
Sat Mar 01 00:00:00 EDT 1975
·
OSTI ID:7308212