Water-hammer experiences in the startup and early operation of the Shearon Harris plant

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:7100677
During the startup testing and initial operation of any power plant, systems undergo planned transients to confirm their ability to respond as designed. In addition to planned testing, unplanned transients infrequently occur as equipment is initially used. Some of both the planned and unplanned transients result in water-hammer events. Several water-hammer events experienced during preoperational testing, power ascension testing, and early operation of the Shearon Harris nuclear power plant are presented. The cause, effect, and corrective actions undertaken to prevent recurrence for each event discussed are provided. In addition, examples of preventive measures taken, based on industry experience accrued at other plants, to prevent a similar occurrence at Shearon Harris are discussed.
OSTI ID:
7100677
Report Number(s):
CONF-8711195-
Conference Information:
Journal Name: Trans. Am. Nucl. Soc.; (United States) Journal Volume: 55
Country of Publication:
United States
Language:
English