New pipeline coating system speeds south Texas rehab--
Journal Article
·
· Oil and Gas Journal; (USA)
OSTI ID:7016344
This paper reports on the use of a new pipeline-coating system during rehabilitation of a 25.4-mile, 26-in. pipeline section in South Texas. The line-travel multicoating system automatically applied a rapid-curing, two-component polyurethane tar coating to pipelines in the field. The system, is engineered to apply any plural component coating material on 24 to 30-in. pipe at rates up to 1 mile/day.
- OSTI ID:
- 7016344
- Journal Information:
- Oil and Gas Journal; (USA), Journal Name: Oil and Gas Journal; (USA) Vol. 88:5; ISSN 0030-1388; ISSN OIGJA
- Country of Publication:
- United States
- Language:
- English
Similar Records
Natural Gas Pipeline Co. rehabilitates an older line
Over ditch coating removal: A key to cutting rehab costs
Rehab projects use current stripping and coating procedures
Journal Article
·
Mon Dec 31 23:00:00 EST 1990
· Pipe Line Industry; (United States)
·
OSTI ID:6091067
Over ditch coating removal: A key to cutting rehab costs
Journal Article
·
Sun Feb 06 23:00:00 EST 1994
· Oil and Gas Journal; (United States)
·
OSTI ID:5394492
Rehab projects use current stripping and coating procedures
Journal Article
·
Sun Mar 10 23:00:00 EST 1991
· Oil and Gas Journal; (USA)
·
OSTI ID:5805668
Related Subjects
03 NATURAL GAS
032000* -- Natural Gas-- Transport
Handling
& Storage
42 ENGINEERING
420205 -- Engineering-- Transport & Storage Facilities-- (1980-)
COATINGS
DESIGN
ENERGY SOURCES
FEDERAL REGION VI
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
MAINTENANCE
NATURAL GAS
NORTH AMERICA
PIPELINES
TEXAS
USA
032000* -- Natural Gas-- Transport
Handling
& Storage
42 ENGINEERING
420205 -- Engineering-- Transport & Storage Facilities-- (1980-)
COATINGS
DESIGN
ENERGY SOURCES
FEDERAL REGION VI
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
MAINTENANCE
NATURAL GAS
NORTH AMERICA
PIPELINES
TEXAS
USA