Chinese pipeline. 1; Automating hot-oil line first step in nationwide system
Journal Article
·
· Oil and Gas Journal; (United States)
OSTI ID:7007093
- Novacorp International Consulting Inc., Calgary (CA)
This paper reports that design and installation of a pipeline automation system in China by Novacorp International Consulting Inc., Calgary, illustrates the experience of a North American company in that country. Automation of Shengli Oil Pipeline Co.'s 153 mile, 28 in. hot oil pipeline from Dongying to Huangdao (Dong-Huang) in Shandong Province, China, consisted of a dual redundant configuration, hot scada (supervisory control and data acquisition) system and a programmable logic controller (PLC) based station control for three pumping stations, one terminal station, and one meter station. During the final year of the project the Chinese Pipeline Bureau (PLB) commissioned a central scada system for all the pipelines in the country. The system center is located at the PLB headquarters in Langfang, Hebei near Beijing. The first link was to the Dong-Huang pipeline's scada system. The PLB has pipeline design personnel and was ultimately responsible for the pipeline design.
- OSTI ID:
- 7007093
- Journal Information:
- Oil and Gas Journal; (United States), Journal Name: Oil and Gas Journal; (United States) Vol. 90:35; ISSN OIGJA; ISSN 0030-1388
- Country of Publication:
- United States
- Language:
- English
Similar Records
Communications, customs, organization slowed project
138 rigs are operating in 59-field Shengli area
U. K. products pipeline installs new SCADA system
Journal Article
·
Mon Sep 21 00:00:00 EDT 1992
· Oil and Gas Journal; (United States)
·
OSTI ID:7249079
138 rigs are operating in 59-field Shengli area
Journal Article
·
Wed Feb 28 23:00:00 EST 1990
· World Oil; (USA)
·
OSTI ID:6934586
U. K. products pipeline installs new SCADA system
Journal Article
·
Sun Mar 29 23:00:00 EST 1992
· Oil and Gas Journal; (United States)
·
OSTI ID:5517792