Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Feasibility assessment of coal-integrated-gasification combined-cycle (IGCC) power technology for India. Final report. Export trade information

Technical Report ·
OSTI ID:6911561

The document is the final report of a feasibility study conducted by Fluor Daniel for the Petroleum Authority of India. The purpose of the study was to determine the high priority projects for gas pipeline expansion. The high priority projects identified as a result of the study are: a new pipeline from the Erawan Complex to Khanow; a new pipeline from the 'B' structure to the Erawon Complex; and the modernization of the Supervisory Control and Data Acquisition (SCADA)/Telecommunications system. The document discusses the economic and technical feasbility of each of these projects. In addition, other topics, such as current and projected gas supply, projected gas demand and sources of additional gas, are discussed.

Research Organization:
Bechtel National, Inc., Arlington, VA (United States)
OSTI ID:
6911561
Report Number(s):
PB-93-107845/XAB
Country of Publication:
United States
Language:
English