Morrow Point dam and powerplant foundation investigations: A water resources technical publication. Final report
Technical Report
·
OSTI ID:6892224
The purpose of this report is to allow the Bureau of Reclamation to share its technical findings--in a new venture--with other technically interested parties. Both the thin-arch double-curvature concrete dam and the underground powerplant at Morrow Point represent firsts for the Bureau. A variety of concepts and methods were introduced in foundation investigation, and extensive rock-testing programs coordinated with one of the most extensive geologic investigations ever made by the Bureau are being completed prior to the design and construction of the features.
- Research Organization:
- Bureau of Reclamation, Denver, CO (United States)
- OSTI ID:
- 6892224
- Report Number(s):
- PB-95-143756/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Morrow point underground powerplant rock mechanics investigations: A water resources technical publication. Final report
Hydraulic model studies for Morrow Point Dam. Engineering monograph No. 37 (Final)
Morrow Point dam and powerplant, Colorado River Storage Project, Gunninson Division, Curecanti Unit, Colorado. Technical record of design and construction. A water resources technical publication. Final report
Technical Report
·
Tue Feb 28 23:00:00 EST 1967
·
OSTI ID:6677227
Hydraulic model studies for Morrow Point Dam. Engineering monograph No. 37 (Final)
Technical Report
·
Sat Dec 31 23:00:00 EST 1966
·
OSTI ID:6842290
Morrow Point dam and powerplant, Colorado River Storage Project, Gunninson Division, Curecanti Unit, Colorado. Technical record of design and construction. A water resources technical publication. Final report
Technical Report
·
Thu Sep 01 00:00:00 EDT 1983
·
OSTI ID:6892260