Morrow Point dam and powerplant, Colorado River Storage Project, Gunninson Division, Curecanti Unit, Colorado. Technical record of design and construction. A water resources technical publication. Final report
Technical Report
·
OSTI ID:6892260
This technical record of design and construction for Morrow Point Dam and Powerplant is divided into three parts. Part I is devoted to the general planning, historical information, description of features, summary of costs, and geology. Part II covers the design of the various features and their components. Part III covers contract administration, construction operations, and equipment installations.
- Research Organization:
- Bureau of Reclamation, Denver, CO (United States)
- OSTI ID:
- 6892260
- Report Number(s):
- PB-95-145637/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Flaming Gorge Dam and powerplant: Technical record of design and construction. A water resources technical publication. Final report
Glen Canyon dam and powerplant (constructed 1957-1966). Technical record of design and construction. A water resources technical publication. Final report
Yellowtail dam and powerplant (constructed 1961-1966). Technical record of design and construction. Final report
Technical Report
·
Sun Dec 31 23:00:00 EST 1967
·
OSTI ID:6677239
Glen Canyon dam and powerplant (constructed 1957-1966). Technical record of design and construction. A water resources technical publication. Final report
Technical Report
·
Mon Nov 30 23:00:00 EST 1970
·
OSTI ID:6892242
Yellowtail dam and powerplant (constructed 1961-1966). Technical record of design and construction. Final report
Technical Report
·
Thu May 01 00:00:00 EDT 1975
·
OSTI ID:6892190