Multi-pattern low-tension demonstration flood Big Muddy Field. Progress report, July-September 1983
Technical Report
·
OSTI ID:6864104
Polymer injection continued through the third quarter of 1983, bringing the total polymer-pusher slug size to 674,000 barrels. The average injection rate for the quarter was 1707 BPD, which is comparable to the previous quarter average of 1713 BPD. During the third quarter, the injection plant was down due to three separate power failures of 2 to 3 hours duration each. Oil sales averaged 193 BOPD, 202 BOPD and 199 BOPD for July, August and September, respectively. All three months were low due to downtime. Wells 54, 57, 58 and 100 experienced three separate power failures in August and September (all 4 wells are on the same power pole). In addition, the entire field was down two separate days due to major electrical storms. Cumulative project production is 129,453 barrels of oil as of September 30, 1983. Sulfonate production was observed in all producing wells with Well 88 (2000 ppM) and Wells 87 and 95 (500 ppM) showing the highest concentrations. Most other wells were 50 ppM or less in sulfonate. Construction of the auxiliary treating facility is complete, and de-bugging tests are underway. Major treating problems have not occurred yet. 6 figures, 4 tables.
- Research Organization:
- Conoco, Inc., Casper, WY (USA)
- DOE Contract Number:
- AC03-78SF01424
- OSTI ID:
- 6864104
- Report Number(s):
- DOE/SF/01424-T4; ON: DE84002282
- Country of Publication:
- United States
- Language:
- English
Similar Records
Multi-pattern low-tension demonstration flood, Big Muddy Field. Progress report, October-December 1983
Multi-pattern low-tension demonstration flood Big Muddy field. Technical progress report, April through June 1983
Multi-pattern low-tension demonstration flood Big Muddy Field. (Technical progress report), October-December 1984
Technical Report
·
Sat Dec 31 23:00:00 EST 1983
·
OSTI ID:5362808
Multi-pattern low-tension demonstration flood Big Muddy field. Technical progress report, April through June 1983
Technical Report
·
Fri Dec 31 23:00:00 EST 1982
·
OSTI ID:5945838
Multi-pattern low-tension demonstration flood Big Muddy Field. (Technical progress report), October-December 1984
Technical Report
·
Sat Dec 31 23:00:00 EST 1983
·
OSTI ID:6044066
Related Subjects
02 PETROLEUM
020300* -- Petroleum-- Drilling & Production
ADDITIVES
DATA
ENERGY SOURCES
ENHANCED RECOVERY
EXPERIMENTAL DATA
FEDERAL REGION VIII
FIELD TESTS
FLUID INJECTION
FOSSIL FUELS
FUELS
INFORMATION
NORTH AMERICA
NUMERICAL DATA
OIL WELLS
PETROLEUM
POLYMERS
PRODUCTION
RECOVERY
SALES
STIMULATION
TESTING
USA
WATERFLOODING
WELL STIMULATION
WELLS
WYOMING
020300* -- Petroleum-- Drilling & Production
ADDITIVES
DATA
ENERGY SOURCES
ENHANCED RECOVERY
EXPERIMENTAL DATA
FEDERAL REGION VIII
FIELD TESTS
FLUID INJECTION
FOSSIL FUELS
FUELS
INFORMATION
NORTH AMERICA
NUMERICAL DATA
OIL WELLS
PETROLEUM
POLYMERS
PRODUCTION
RECOVERY
SALES
STIMULATION
TESTING
USA
WATERFLOODING
WELL STIMULATION
WELLS
WYOMING