skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Automating existing stations

Journal Article · · Pipeline Gas J.; (United States)
OSTI ID:6840900

The task was to automate 20 major compressor stations along ANR Pipeline Co.'s Southeastern and Southwestern pipelines in as many months. Meeting this schedule required standardized hardware and software design. Working with Bristol Babcock Co., ANR came up with an off-the-shelf station automation package suitable for a variety of compressor stations. The project involved 148 engines with 488,880-hp in the 20 stations. ANR Pipeline developed software for these engines and compressors, including horsepower prediction and efficiency. The system places processors ''intelligence'' at each station and engine to monitor and control operations. The station processor receives commands from the company's gas dispatch center at Detroit and informs dispatchers of alarms, conditions, and decision it makes. The automation system is controlled by the Detroit center through a central communications network. Operating orders from the center are sent to the station processor, which obeys orders using the most efficient means of operation at the station's disposal. In a malfunction, a control and communications backup system takes over. Commands and information are directly transmitted between the center and the individual compressor stations. Stations receive their orders based on throughput, with suction and discharge pressure overrides. Additionally, a discharge temperature override protects pipeline coatings.

Research Organization:
ANR Pipeline Co., Detroit, MI
OSTI ID:
6840900
Journal Information:
Pipeline Gas J.; (United States), Vol. 213:9
Country of Publication:
United States
Language:
English