Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates
Conference
·
OSTI ID:682313
- Southern Company Services, Inc., Birmingham, AL (United States)
The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.
- Research Organization:
- National Mining Association, Washington, DC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 682313
- Report Number(s):
- CONF-970121--Vol.2; ON: DE97007477
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operational highlights of the Chiyoda CT-121 FDG demonstration at Georgia Power`s Plant Yates
Evaluation of fiber-reinforced plastics for use in Chiyoda Thoroughbred-121 flue gas desulfurization process vessels
Final results for the EPRI-DOE-SCS Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates
Technical Report
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:123442
Evaluation of fiber-reinforced plastics for use in Chiyoda Thoroughbred-121 flue gas desulfurization process vessels
Technical Report
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:121517
Final results for the EPRI-DOE-SCS Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates
Conference
·
Tue Dec 30 23:00:00 EST 1997
·
OSTI ID:324753