Waste Isolation Pilot Plant dry bin-scale integrated systems checkout plan
The Integrated Systems Checkout Plan (ISCP) addresses a two-phase approach to ensuring WIPP readiness to support the Dry Bin-Scale CH TRU Waste Test. The first phase includes all those activities necessary to ensure readiness of individual systems and equipment. The second phase is a bin-scale integrated checkout using four mock bins. The ISCP has been developed to provide assurance that operational activities dedicated to supporting the bin-scale tests can be achieved safely. To attain this assurance, a systematic approach will address: development of procedures to control system and equipment start-up and acceptance tests; development of procedures to control operation of systems and equipment, waste receipt, emplacement, operation, test termination, waste retrieval, and post-test shipping; monitoring of systems installation and checkout to ensure systems meet acceptance testing criteria; initial operation of systems to validate procedural controls; training of personnel to perform systems operational activities in accordance with procedural controls; capability of corrective action for abnormal events; and documentation of acceptance testing data and personnel training and qualification requirements. 11 refs., 7 figs., 2 tabs.
- Research Organization:
- Westinghouse Electric Corp., Carlsbad, NM (USA). Waste Isolation Div.
- Sponsoring Organization:
- DOE/DP
- DOE Contract Number:
- AC04-86AL31950
- OSTI ID:
- 6815856
- Report Number(s):
- DOE/WIPP-90-002; ON: DE90013697
- Country of Publication:
- United States
- Language:
- English
Similar Records
Waste Isolation Pilot Plant Dry Bin-Scale Integrated Systems Checkout Plan
Waste Isolation Pilot Plant CH TRU preoperational checkout plan
Related Subjects
ALPHA-BEARING WASTES
CONTACT HANDLING
CONTAINERS
TESTING
EQUIPMENT
BACKFILLING
BENTONITE
BRINES
ENVIRONMENTAL IMPACTS
GETTERS
PILOT PLANTS
RADIOACTIVE WASTE DISPOSAL
RADIOACTIVE WASTE FACILITIES
SALTS
VOLATILE MATTER
WASTE FORMS
WIPP
CLAYS
FUNCTIONAL MODELS
MANAGEMENT
MATERIALS
MATTER
NATIONAL ORGANIZATIONS
NUCLEAR FACILITIES
RADIOACTIVE MATERIALS
RADIOACTIVE WASTES
UNDERGROUND FACILITIES
US DOE
US ORGANIZATIONS
WASTE DISPOSAL
WASTE MANAGEMENT
WASTES
420203* - Engineering- Handling Equipment & Procedures