skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Isolation Pilot Plant Dry Bin-Scale Integrated Systems Checkout Plan

Technical Report ·
OSTI ID:6124339

In order to determine the long-term performance of the Waste Isolation Pilot Plant (WIPP) disposal system, in accordance with the requirements of the US Environmental Protection Agency (EPA) Standard 40 CFR 191, Subpart B, Sections 13 and 15, two performance assessment tests will be conducted. The tests are titled WIPP Bin-Scale Contact Handled (CH) Transuranic (TRU) Waste Tests and WIPP In Situ Alcove CH TRU Waste Tests. These tests are designed to measure the gas generation characteristics of CH TRU waste. Much of the waste will be specially prepared to provide data for a better understanding of the interactions due to differing degradation modes, waste forms, and repository environmental affects. The bin-scale test is designed to emplace nominally 146 bins. The majority of the bins will contain various forms of waste. Eight bins will be used as reference bins and will contain no waste. This checkout plan exercises the systems, operating procedures, and training readiness of personnel to safely carry out those specifically dedicated activities associated with conducting the bin-scale test plan for dry bins only. The plan does not address the entire WIPP facility readiness state. 18 refs., 6 figs., 3 tabs.

Research Organization:
Westinghouse Electric Corp., Carlsbad, NM (USA). Waste Isolation Div.
Sponsoring Organization:
USDOE; USDOE, Washington, DC (USA)
DOE Contract Number:
AC04-86AL31950
OSTI ID:
6124339
Report Number(s):
DOE/WIPP-90-002-Rev.2; ON: DE91010648
Country of Publication:
United States
Language:
English