Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume II. Detailed technical plan. Revision 2
The four sections which comprise Part II describe in detail the technical basis for each of the four Program Elements (PE's) of the FWBS Engineering Technology Program (ETP). Each PE is planned to be executed in a number of phases. The purpose of the DTP's is to delineate detailed near-term research, development, and testing required to establish a FWBS engineering data base. Optimum testing strategies and construction of test facilities where needed are identified. The DTP's are based on guidelines given by Argonne National Laboratory which included the basic programmatic goals and the requirements for the types of tests and test conditions.
- Research Organization:
- Argonne National Lab., IL (USA)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 6814189
- Report Number(s):
- ANL/FPP/TM-161-Vol.2; ON: DE83000861
- Country of Publication:
- United States
- Language:
- English
Similar Records
Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume I. Summary, objectives and management. Revision 2
Initial progress in the first wall, blanket and shield engineering test program for magnetically confined fusion power reactors
Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair
Technical Report
·
Sun Aug 01 00:00:00 EDT 1982
·
OSTI ID:6779263
Initial progress in the first wall, blanket and shield engineering test program for magnetically confined fusion power reactors
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Proc. Symp. Eng. Probl. Fusion Res.; (United States)
·
OSTI ID:6482109
Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair
Technical Report
·
Thu Dec 29 23:00:00 EST 1983
·
OSTI ID:5309464