Initial progress in the first wall, blanket and shield engineering test program for magnetically confined fusion power reactors
Conference
·
· Proc. Symp. Eng. Probl. Fusion Res.; (United States)
OSTI ID:6482109
The first wall/blanket/shield (FW/B/S) Engineering Test Program (ETP) progresses from the planning stage into implementation during July, 1981. the overall background and scope have been described in detail in earlier reports. The program, generic in nature, comprises four test Program Elements (TPE'S) the emphasis of which is on defining the performance parameters for the Fusion Engineering Device (FED) and the major fusion device to follow FED. These elements are discussed here.
- Research Organization:
- Argonne Natl Lab, IL, USA
- OSTI ID:
- 6482109
- Report Number(s):
- CONF-811040-
- Journal Information:
- Proc. Symp. Eng. Probl. Fusion Res.; (United States), Journal Name: Proc. Symp. Eng. Probl. Fusion Res.; (United States); ISSN PSERD
- Country of Publication:
- United States
- Language:
- English
Similar Records
Initial progress in the first wall, blanket, and shield Engineering Test Program for magnetically confined fusion-power reactors
First Wall, Blanket, Shield Engineering Technology Program
Heating calculations of fusion blanket experiments in a fission reactor
Conference
·
Thu Oct 01 00:00:00 EDT 1981
·
OSTI ID:6231362
First Wall, Blanket, Shield Engineering Technology Program
Conference
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:6409724
Heating calculations of fusion blanket experiments in a fission reactor
Technical Report
·
Sun Nov 30 23:00:00 EST 1980
·
OSTI ID:6328848