High-Temperature-Turbine-Technology Program. Phase II. Technology test and support studies. Technical progress report, 1 January-31 March 1981
Technical Report
·
OSTI ID:6811327
This report presents the status of work performed on the High Temperature Turbine Technology Program, Phase II Technology Test and Support Studies during the first quarter of 1981, January 1 through March 31, 1981. Work is in progress to prepare the Turbine Spool Technology Rig (TSTR) for a 100 h test with contaminated fuel. The 60/sup 0/ Sector TSTR Combustor Rig is being prepared for test to verify the contaminant injection system operation and its effect on the exit temperature profile. This information will be used to modify the TSTR combustor prior to test. The status of the combustor development is given for (a) LBG Combustor (Fuel Cooled) and (b) High Temperature Low Emissions Combustor for coal-derived liquid fuel. Both of these combustors are in the design stage. Control systems status and descriptions for the above items are given. The analytical studies to support the combustor programs are described. Oxidation testing of Nichrome V-Cb material porous mesh for transpiration air cooled turbine airfoils is reviewed.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC01-76ET10348
- OSTI ID:
- 6811327
- Report Number(s):
- CW-WR-76-020.80A; FE-2291-80A1; ON: DE81028443
- Country of Publication:
- United States
- Language:
- English
Similar Records
High temperature turbine technology program. Phase II. Technology test and support studies. Technical progress report, April 1, 1981-June 30, 1981
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Annual technical progress report, January 1-December 31, 1981
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Technical progress report, July 1-September 30, 1981
Technical Report
·
Wed Jul 01 00:00:00 EDT 1981
·
OSTI ID:5280160
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Annual technical progress report, January 1-December 31, 1981
Technical Report
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:5346158
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Technical progress report, July 1-September 30, 1981
Technical Report
·
Sat Oct 31 23:00:00 EST 1981
·
OSTI ID:5279923
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
CHEMICAL REACTIONS
COAL LIQUIDS
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DESIGN
FLUIDS
FUEL GAS
FUEL INJECTION SYSTEMS
FUEL SYSTEMS
FUELS
GAS FUELS
GAS TURBINES
GASES
LIQUIDS
LOW BTU GAS
MACHINERY
OXIDATION
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
CHEMICAL REACTIONS
COAL LIQUIDS
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DESIGN
FLUIDS
FUEL GAS
FUEL INJECTION SYSTEMS
FUEL SYSTEMS
FUELS
GAS FUELS
GAS TURBINES
GASES
LIQUIDS
LOW BTU GAS
MACHINERY
OXIDATION
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE