High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Technical progress report, July 1-September 30, 1981
Technical Report
·
OSTI ID:5279923
The status of work performed on the High Temperature Turbine Technology Program, Phase II Technology Test and Support Studies during the third quarter of 1981, July 1-September 30, 1981 is reported. Testing of the Turbine Spool Technology Rig (TSTR) was initiated. Performance calibrations were performed at several turbine stator throat area settings, followed by steady-state operation at 2600/sup 0/F turbine inlet temperature with fly ash particulates injected into the hot gas stream at the primary zone of the combustor. After approximately 36-1/2 hours of test time, a labyrinth seal on the turbine vane cooling air impeller failed, causing foreign object damage to a number of turbine blades. The test has been interrupted to repair blades, to make changes ot the impeller seal arrangement to preclude future failures and to ensure adequate sealing at the failure location. Observations of the turbine indicate minimal effects from the high temperature and gas stream contaminants. The development status of both the low Btu gas fuel cooled combustor and high temperature, low emissions coal-derived liquid-fueled combustor are reviewed. Both of these programs are in the component fabrication phase leading to test evaluation during the fourth quarter. Control systems status and descriptions for the above items are given. The anaytical studies to support the TSTR and combustor programs are described. Extended time oxidation testing of Nichrome V-Cb material porous mesh for transpiration air cooled turbine airfoils is continuing; furnace exposure time is now over 3000 h.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC01-76ET10348
- OSTI ID:
- 5279923
- Report Number(s):
- CW-WR-76-020.95A; FE-2291-95A; ON: DE82014545
- Country of Publication:
- United States
- Language:
- English
Similar Records
High temperature turbine technology program. Phase II. Technology test and support studies. Technical progress report, April 1, 1981-June 30, 1981
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Annual technical progress report, January 1-December 31, 1981
High-Temperature-Turbine-Technology Program. Phase II. Technology test and support studies. Technical progress report, 1 January-31 March 1981
Technical Report
·
Wed Jul 01 00:00:00 EDT 1981
·
OSTI ID:5280160
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Annual technical progress report, January 1-December 31, 1981
Technical Report
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:5346158
High-Temperature-Turbine-Technology Program. Phase II. Technology test and support studies. Technical progress report, 1 January-31 March 1981
Technical Report
·
Fri May 01 00:00:00 EDT 1981
·
OSTI ID:6811327
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200104* -- Fossil-Fueled Power Plants-- Components
CHEMICAL REACTIONS
COAL LIQUIDS
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DESIGN
EROSION
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASES
LIQUIDS
LOW BTU GAS
MACHINERY
OXIDATION
PERFORMANCE
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINE BLADES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE
200104* -- Fossil-Fueled Power Plants-- Components
CHEMICAL REACTIONS
COAL LIQUIDS
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DESIGN
EROSION
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASES
LIQUIDS
LOW BTU GAS
MACHINERY
OXIDATION
PERFORMANCE
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINE BLADES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE