Test Series 2. 2: Detailed Test Plan

Technical Report ·
OSTI ID:6810185
Test Series 2.2 comprises the third sub-series of tests to be scheduled as a part of Test Series 2, the second stage of the combustion research program to be carried out at the Grimethorpe Experimental Pressurized Fluidized Bed Combustion Facility. Test Series 2.1, the first sub-series of tests, was completed in February 1983, and the first half of the second sub-series, Test Series 2.3, in October 1983. Test Series 2.2 is to consist of 350 data gathering hours, which it is hoped to complete within 560 coal burning hours. This document provides a brief description of the Facility and modifications which have been made following the completion of Test Series 2.1. No further modifications were made following the completion of the first half of Test Series 2.3. The operating requirements are specified. The tests will be performed using a UK coal (Kiveton Park), and a UK limestone (Middleton) both nominated by the FRG. Nine objectives are proposed which are to be fulfilled by thirteen test conditions. Six part load tests are included, as defined by Kraftwerk Union AG. The cascade is expected to be on line for each test condition and total cascade exposure is expected to be in excess of 450 hours. Details of sampling and special measurements are given. A test plan schedule envisages the test series being completed within a two month calendar period. Finally, a number of contingency strategies are proposed.
Research Organization:
NCB (IEA Grimethorpe) Ltd., Grimethorpe, Barnsley, South Yorkshire (UK)
DOE Contract Number:
AI01-76ET10393
OSTI ID:
6810185
Report Number(s):
DOE/ET/10393-1566; ON: DE84003099
Country of Publication:
United States
Language:
English