Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Test Series 2. 4: detailed test plan

Technical Report ·
OSTI ID:6328242
Test Series 2.4 comprises the fourth sub-series of tests to be scheduled as a part of Test Series 2, the second stage of the combustion research program to be carried out at the Grimethorpe Experimental Pressurized Fluidized Bed Combustion Facility. Test Series 2.1, the first sub-series of tests, was completed in February 1983, and the first part of the second sub-series, Test Series 2.3, in October 1983. Test Series 2.2 was completed in February 1984 after which the second part of Test Series 2.3 commenced. The Plan for Test Series 2.4 consists of 350 data gathering hours to be completed within 520 coal burning hours. This document provides a brief description of the Facility and modifications which have been made following the completion of Test Series 2.1. No further modifications were made following the completion of the first part of Test Series 2.3 or Test Series 2.2. The operating requirements for Test Series 2.4 are specified. The tests will be performed using a UK coal (Lady Windsor), and a UK limestone (Middleton) both nominated by the FRG. Seven objectives are proposed which are to be fulfilled by thirteen test conditions. Six part load tests based on input supplied by Kraftwerk Union AG are included. The cascade is expected to be on line for each test condition and total cascade exposure is expected to be in excess of 450 hours. Details of sampling and special measurements are given. A test plan schedule envisages the full test series being completed within a two month calendar period. Finally, a number of contingency strategies are proposed. 3 figures, 14 tables.
Research Organization:
NCB (IEA Grimethorpe) Ltd., Grimethorpe, Barnsley, South Yorkshire (UK)
DOE Contract Number:
AI01-76ET10393
OSTI ID:
6328242
Report Number(s):
DOE/ET/10393-1657; ON: DE84012000
Country of Publication:
United States
Language:
English