Industrial application of fluidized-bed combustion. Quarterly technical progress report, October-December, 1979
Technical Report
·
OSTI ID:6781024
In line with a determination by the Federal Government that a fluidized bed combustion process can efficiently convert the energy of coal to usable power in an environmentally acceptable manner, Georgetown University was awarded contract E(49-18)-2461 to construct and operate a demonstration plant. Construction of an atmospheric fluidized bed boiler for burning high-sulfur coals was completed in November 1979. Progress made during the second quarter of plant startup is reported. In the October through December 1979 quarter, the FBC boiler was operated for 694 hours during 9 separate runs. Of these additional hours of operation, 78 1/2 hours were on two beds, and the balance on one bed. Steam generation rates ranged from 18,000 to 80,000 lb/h. A peak generation rate of 56,000 lb/h was achieved on one bed alone. Boiler operations at levels in excess of 80,000 lb/h were precluded by the relatively mild Fall weather encountered, which limited the peak campus steam load to 80,000 lb/h. The boiler was operated through the first week in December at which time the plant was shut down for the balance of the Quarter for inspection and to complete various modifications, the most important of which were the installation of grid plate seals within the boiler, and modifications of the flyash reinjection blowers. With these modifications, the boiler is ready for extensive performance testing in January 1980. (LCL)
- Research Organization:
- Georgetown Univ., Washington, DC (USA)
- DOE Contract Number:
- AC21-76ET10381
- OSTI ID:
- 6781024
- Report Number(s):
- DOE/ET/10381-T2
- Country of Publication:
- United States
- Language:
- English
Similar Records
Industrial application of fluidized-bed combustion. Quarterly technical progress report, April-June, 1980
Industrial application of fluidized-bed combustion. Quarterly technical progress report for the period July-September 1981
Industrial application of fluidized-bed combustion. Quarterly technical progress report, April-June, 1981
Technical Report
·
Mon Dec 31 23:00:00 EST 1979
·
OSTI ID:6476285
Industrial application of fluidized-bed combustion. Quarterly technical progress report for the period July-September 1981
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:5222097
Industrial application of fluidized-bed combustion. Quarterly technical progress report, April-June, 1981
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:5554002
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200104* -- Fossil-Fueled Power Plants-- Components
AIR POLLUTION CONTROL
BOILERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COMBUSTION
COMBUSTORS
DATA
ENERGY SOURCES
EXPERIMENTAL DATA
FLUIDIZED-BED COMBUSTION
FLUIDIZED-BED COMBUSTORS
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUELS
INFORMATION
MATERIALS
NUMERICAL DATA
OPERATION
OXIDATION
PERFORMANCE
POLLUTION CONTROL
POWER PLANTS
RESEARCH PROGRAMS
STEAM GENERATORS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
VAPOR GENERATORS
200104* -- Fossil-Fueled Power Plants-- Components
AIR POLLUTION CONTROL
BOILERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COMBUSTION
COMBUSTORS
DATA
ENERGY SOURCES
EXPERIMENTAL DATA
FLUIDIZED-BED COMBUSTION
FLUIDIZED-BED COMBUSTORS
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUELS
INFORMATION
MATERIALS
NUMERICAL DATA
OPERATION
OXIDATION
PERFORMANCE
POLLUTION CONTROL
POWER PLANTS
RESEARCH PROGRAMS
STEAM GENERATORS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
VAPOR GENERATORS