Progress is reported on a project to evaluate fluidized bed combustors for industrial steam generation at Georgetown University. The July through September 1981 period constituted the eighth full quarter of Task 4 Operations in which plant operations were essentially performed by the Georgetown University staff. Boiler operations during the quarter were limited to a single period extending from August 4 through August 18 during which 331 hours of steam generation were logged. Operations before August 4 were held up to permit completion of the modifications undertaken in the second quarter of 1981. On August 18, the plant was shut down because boiler in-bed tube shields were falling off and causing blockages in the bed material removal system. Coincidentally, stack opacity was increasing due to failure of two bags in the 792-bag baghouse. This single run, however, revealed a significant increase in thermal efficiency to 77.1%. This increase was attributable to the success of the newly installed airlocks below the mechanical dust collector in reinjecting all flyash collected at this point. Unfortunately, the successful reinjection of flyash from the dust collector increased the flue gas dust loading in the boiler to the point where the cinder trap eductors could not keep pace with the flyash collected at this point. Efforts will be made to correct this situation in succeeding operations. The problem of excessive pressure drop across the baghouse at high load levels remains. Modifications made during the quarter were not successful in eliminating this problem and further changes and envaluations are contemplated for the succeeding quarter.
- Research Organization:
- George Washington Univ., Washington, DC (USA)
- DOE Contract Number:
- AC21-76ET10381
- OSTI ID:
- 5222097
- Report Number(s):
- DOE/ET/10381-1143; ON: DE82009858
- Country of Publication:
- United States
- Language:
- English
Similar Records
Industrial application of fluidized-bed combustion. Quarterly technical progress report, April-June, 1981
Industrial application of fluidized-bed combustion. Quarterly technical progress report, January-March 1981
Industrial application of fluidized-bed combustion. Quarterly technical progress report, October-December, 1979
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:5554002
Industrial application of fluidized-bed combustion. Quarterly technical progress report, January-March 1981
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6298923
Industrial application of fluidized-bed combustion. Quarterly technical progress report, October-December, 1979
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:6781024
Related Subjects
42 ENGINEERING
421000* -- Engineering-- Combustion Systems
AEROSOL WASTES
AIR POLLUTION CONTROL
ASHES
BAGHOUSES
BOILERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COMBUSTION
CONTROL
DATA
DEMONSTRATION PROGRAMS
DISTRICT HEATING
DUSTS
ENERGY SOURCES
EQUIPMENT
EXPERIMENTAL DATA
FLUE GAS
FLUIDIZED BED BOILERS
FLUIDIZED-BED COMBUSTION
FLY ASH
FOSSIL FUELS
FUELS
GASEOUS WASTES
HEATING
INDUSTRIAL PLANTS
INFORMATION
MATERIALS
NUMERICAL DATA
OPERATION
OXIDATION
PERFORMANCE
POLLUTION CONTROL
POLLUTION CONTROL EQUIPMENT
RESIDUES
STEAM GENERATION
THERMOCHEMICAL PROCESSES
WASTES
421000* -- Engineering-- Combustion Systems
AEROSOL WASTES
AIR POLLUTION CONTROL
ASHES
BAGHOUSES
BOILERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COMBUSTION
CONTROL
DATA
DEMONSTRATION PROGRAMS
DISTRICT HEATING
DUSTS
ENERGY SOURCES
EQUIPMENT
EXPERIMENTAL DATA
FLUE GAS
FLUIDIZED BED BOILERS
FLUIDIZED-BED COMBUSTION
FLY ASH
FOSSIL FUELS
FUELS
GASEOUS WASTES
HEATING
INDUSTRIAL PLANTS
INFORMATION
MATERIALS
NUMERICAL DATA
OPERATION
OXIDATION
PERFORMANCE
POLLUTION CONTROL
POLLUTION CONTROL EQUIPMENT
RESIDUES
STEAM GENERATION
THERMOCHEMICAL PROCESSES
WASTES