The magnetohydrodynamics Coal-Fired Flow Facility
Technical Report
·
OSTI ID:6768747
In this quarterly technical progress report, UTSI reports on progress on a multi-task contract to develop the technology for the steam bottoming plant for an MHD Steam Combined Cycle power plant. Two proof-of-concept (POC) tests totaling 614 hours of coal fired operation were conducted during the quarter using low sulfur Montana Rosebud coal. The results of these tests are summarized. Operational aspects of the particulate control devices being evaluated, a dry electrostatic precipitator (ESP) and a reverse air baghouse, are discussed. A sootblowing control system for the convective heat transfer surfaces that senses the need to clean the tubes by temperatures is described. Environmental reporting includes measurement of levels of ground water wells over time and the remote air quality measurements of impact of the stack emissions from the two tests. Results of testing candidate ceramic tubes for a recuperative high temperature air heater are included. Analyses of the tube materials tested in the 2000 hour test series previously completed on high sulfur Illinois No. 6 coal are summarized. Facility maintenance and repair activities for the DOE Coal Fired Flow Facility are summarized. The major facility modification discussed is the completion of the installation of a Wet ESP with rotary vacuum filter which is replacing the venturi scrubber as the primary facility particulate control device for any exhaust gases that are not routed through the dry ESP or baghouse.
- Research Organization:
- Tennessee Univ., Tullahoma, TN (United States). Space Inst.
- Sponsoring Organization:
- DOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-79ET10815
- OSTI ID:
- 6768747
- Report Number(s):
- DOE/ET/10815-202; UTSI--92-11; ON: DE93008882
- Country of Publication:
- United States
- Language:
- English
Similar Records
The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, July 1, 1992--September 30, 1992
The magnetohydrodynamics Coal-Fired Flow Facility
The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, April 1, 1992--June 30, 1992
Technical Report
·
Sun Jan 31 23:00:00 EST 1993
·
OSTI ID:10130123
The magnetohydrodynamics Coal-Fired Flow Facility
Technical Report
·
Mon Jul 01 00:00:00 EDT 1991
·
OSTI ID:6233303
The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, April 1, 1992--June 30, 1992
Technical Report
·
Sun Jan 31 23:00:00 EST 1993
·
OSTI ID:10130126
Related Subjects
30 DIRECT ENERGY CONVERSION
300102* -- MHD Generators-- Performance & Testing
AIR HEATERS
BAGHOUSES
BOTTOMING CYCLES
CARBONACEOUS MATERIALS
COAL
COAL-FIRED MHD GENERATORS
DIRECT ENERGY CONVERTERS
DOCUMENT TYPES
ELECTROSTATIC PRECIPITATORS
EMISSION
ENERGY SOURCES
EQUIPMENT
FOSSIL FUELS
FUELS
HEATERS
MAINTENANCE
MATERIALS
MATERIALS TESTING
MEASURING INSTRUMENTS
MHD GENERATOR CFFF
MHD GENERATORS
PERFORMANCE TESTING
POLLUTION CONTROL EQUIPMENT
PROGRESS REPORT
QUALITY ASSURANCE
REPAIR
TESTING
THERMODYNAMIC CYCLES
300102* -- MHD Generators-- Performance & Testing
AIR HEATERS
BAGHOUSES
BOTTOMING CYCLES
CARBONACEOUS MATERIALS
COAL
COAL-FIRED MHD GENERATORS
DIRECT ENERGY CONVERTERS
DOCUMENT TYPES
ELECTROSTATIC PRECIPITATORS
EMISSION
ENERGY SOURCES
EQUIPMENT
FOSSIL FUELS
FUELS
HEATERS
MAINTENANCE
MATERIALS
MATERIALS TESTING
MEASURING INSTRUMENTS
MHD GENERATOR CFFF
MHD GENERATORS
PERFORMANCE TESTING
POLLUTION CONTROL EQUIPMENT
PROGRESS REPORT
QUALITY ASSURANCE
REPAIR
TESTING
THERMODYNAMIC CYCLES