Some considerations concerning extra high voltage ac cable power transmission

Journal Article · · Trans. Am. Inst. Electr. Eng., Part 3; (United States)
OSTI ID:6767756
In 1958, the first 380-kV overhead lines were energized in France, and the first 380-kV cable sections were connected to the system of the Roselend hydroelectric Plant. It is difficult to state what the next voltage step will be and what adaptations will have to be made. The aim of the present study was to indicate some general ideas concerning the choice of technique and of the cable specifications best suited to meet the problems that may arise with ac underground power transmission. These considerations show that either a technical or an economical optimization is possible and do not pretend to be an exhaustive study of the subject. However, they should be considered as a basis for the study of particular cases and as a guide for adopting solutions.
OSTI ID:
6767756
Journal Information:
Trans. Am. Inst. Electr. Eng., Part 3; (United States), Journal Name: Trans. Am. Inst. Electr. Eng., Part 3; (United States) Vol. 80; ISSN TEEPA
Country of Publication:
United States
Language:
English

Similar Records

New testing laboratory for extra high voltage cable
Journal Article · Wed Sep 01 00:00:00 EDT 1965 · Electr. Eng. (Am. Inst. Electr. Eng.); (United States) · OSTI ID:5857076

Protective relaying considerations for transmission lines with high voltage AC cables
Journal Article · Tue Dec 31 23:00:00 EST 1996 · IEEE Transactions on Power Delivery · OSTI ID:477188

New developments in the field of high voltage and extra-high voltage cables
Journal Article · Sat Mar 31 23:00:00 EST 1990 · IEEE Transactions on Power Delivery (Institute of Electrical and Electronics Engineers); (USA) · OSTI ID:6737137