Battery Energy Storage Test (BEST) Facility: second progress report, December 1979
The Battery Energy Storage Test (BEST) Facility will be a national center for testing and evaluating battery energy storage systems, including associated electrical conversion equipment, developed for use on electric power grids. The BEST Facility program consists of four phases: design, construction, testing and acceptance, and operation. This interim progress report covers a middle period (July 1978 to December 1979) in construction of the facility, in procurement of major items of operating equipment, in developing plans for testing and acceptance of the facility prior to its use, and also in developing the plans for testing of advanced batteries during the subsequent operating life of the facility. Approximately one year remains to completion and acceptance. The building is now 90% complete. The power conversion system was completed and successfully factory tested. The station lead-acid battery modules were built, and the factory tests, completed. The station computer (monitor and control system) hardware was completed and software programming was begun. A startup and acceptance test manual was drafted. It will encompass the four-phase test program: factory testing, construction verification testing, operational testing, and acceptance testing. A Developers Users Group was convened several times, for the purpose of advising on the nature of the test programs and on compiling a Test Programs Guidelines document. Detail planning was also well along for test data processing equipment and procedures. A demonstration of some online computer procedures was given at the annual review meeting, using simulated battery performance data in a data base management system. Planning for the installation of a zinc chloride battery in 1981 in the second test bay was begun. 20 figures.
- Research Organization:
- Public Service Electric and Gas Research Corp., Newark, NJ (USA)
- DOE Contract Number:
- AC02-76ET29368
- OSTI ID:
- 6743206
- Report Number(s):
- EPRI-EM-1514
- Country of Publication:
- United States
- Language:
- English
Similar Records
Battery Energy Storage Test (BEST) facility summary report 1976-1986
Battery Energy Storage Test (BEST) Facility first progress report
Related Subjects
250903* -- Energy Storage-- Batteries-- Materials
Components
& Auxiliaries
CONSTRUCTION
ELECTRIC BATTERIES
ELECTROCHEMICAL CELLS
ENERGY STORAGE
EQUIPMENT INTERFACES
LEAD-ACID BATTERIES
OFF-PEAK ENERGY STORAGE
ON-LINE MEASUREMENT SYSTEMS
ON-LINE SYSTEMS
PERFORMANCE TESTING
PLANNING
STORAGE
TESTING