Preheated coal operations at Redcar coke ovens

Journal Article · · Ironmaking Proc., Metall. Soc. AIME; (United States)
OSTI ID:6729567
A preheated pipeline-charged coke-oven battery was built at Redcar to produce high-quality coke for the 14m blast furnace. Major difficulties were experienced from the time of commissioning. Problems with charge rate/weight control, coal profile, charge main blockages and blocked ascension pipes caused severe pressure surges on oven frames and doors. This reduced oven availability, and together with high oven centre pressures, variable bulk density and heating problems, caused oven wall distortion. Most of these were eventually controlled, before the onset of wall failure necessitated closure of the plant. The problems experienced, modifications made and problems remaining are described. The rebuilt ovens will be wet charged.
OSTI ID:
6729567
Journal Information:
Ironmaking Proc., Metall. Soc. AIME; (United States), Journal Name: Ironmaking Proc., Metall. Soc. AIME; (United States) Vol. 42; ISSN IRMPA
Country of Publication:
United States
Language:
English

Similar Records

Pipeline charging of coke ovens with a preheated charge
Journal Article · Fri Dec 31 23:00:00 EST 1982 · Coke Chem. USSR (Engl. Transl.); (United States) · OSTI ID:6911634

Pipeline charging of coke ovens with a preheated charge
Journal Article · Mon Feb 28 23:00:00 EST 1983 · Coke Chem. USSR (Engl. Transl.); (United States) · OSTI ID:5166529

Pipeline charging of coke ovens with a preheated charge
Journal Article · Fri Dec 31 23:00:00 EST 1982 · Coke Chem. USSR (Engl. Transl.); (United States) · OSTI ID:5134228