skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Conceptual capital-cost estimate and facility design of the Mirror-Fusion Technology Demonstration Facility

Technical Report ·
DOI:https://doi.org/10.2172/6705805· OSTI ID:6705805

This report contains contributions by Bechtel Group, Inc. to Lawrence Livermore National Laboratory (LLNL) for the final report on the conceptual design of the Mirror Fusion Technology Demonstration Facility (TDF). Included in this report are the following contributions: (1) conceptual capital cost estimate, (2) structural design, and (3) plot plan and plant arrangement drawings. The conceptual capital cost estimate is prepared in a format suitable for inclusion as a section in the TDF final report. The structural design and drawings are prepared as partial inputs to the TDF final report section on facilities design, which is being prepared by the FEDC.

Research Organization:
Bechtel Group, Inc., San Francisco, CA (USA)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
6705805
Report Number(s):
UCRL-15507; ON: DE83002278
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English