Commercial conceptual design and commercial feasibility evaluation for clean boiler fuel facility. Capital cost escalation and validation of DRAVO report/cost estimate, February 1976
The US Army Engineer Division Huntsville (USAEDH) has reviewed, validated and updated a capital cost estimate of the ''Conceptual Commercial Design and Commerical Feasibility Evaluation for Clean Boiler Fuel Facility'', Report No. FE-1772-13 dated February 1976, as prepared by DRAVO Corporation, Pittsburgh, PA. This facility was designed to have a feed rate of 50,000 tons of coal per day and is expected to produce 58,000 barrels per day of heavy fuel oil, 21,000 barrels per day of light fuel oil, 122 million standard cubic feet per day of LPG fraction, 240 million standard cubic feed per day of pipeline gas, 170 tons per day of ammonia and 1100 tons per day of sulfur. Capital cost was estimated by DRAVO to be at 1.2 billion dollars based on last quarter 1975 dollars. Escalation and validation by USAEDH resulted in a fixed capital cost of $1.16 billion dollars for the facility. The overall accuracy factor of the DRAVO estimate was determined to be plus or minus 17%.
- Research Organization:
- Corps of Engineers, Huntsville, Ala. (USA)
- DOE Contract Number:
- EX-76-C-01-1759
- OSTI ID:
- 5256203
- Report Number(s):
- FE-1759-3
- Country of Publication:
- United States
- Language:
- English
Similar Records
Commercial conceptual design and commerical feasibility evaluation for clean boiler fuel facility. Capital cost validation of COALCON report/cost estimate, June 1977
Oil-Gas Plant Design Project capital cost validation
Conceptual design of a coal to methanol commercial plant: capital cost validation
Technical Report
·
Wed Nov 30 23:00:00 EST 1977
·
OSTI ID:5032604
Oil-Gas Plant Design Project capital cost validation
Technical Report
·
Tue Mar 29 23:00:00 EST 1977
·
OSTI ID:7081446
Conceptual design of a coal to methanol commercial plant: capital cost validation
Technical Report
·
Thu Feb 09 23:00:00 EST 1978
·
OSTI ID:6672024
Related Subjects
01 COAL, LIGNITE, AND PEAT
010405* -- Coal
Lignite
& Peat-- Hydrogenation & Liquefaction
090320 -- Inorganic Hydrogen Compound Fuels-- Preparation-- (1976-1989)
10 SYNTHETIC FUELS
AMMONIA
BOILER FUEL
CAPITAL
COAL LIQUEFACTION PLANTS
COST
DESIGN
ELEMENTS
ENERGY SOURCES
ENGINEERING
FLUIDS
FUEL GAS
FUEL OILS
FUELS
GAS FUELS
GASES
HIGH BTU GAS
HYDRIDES
HYDROGEN COMPOUNDS
INDUSTRIAL PLANTS
LIQUEFIED PETROLEUM GASES
NATURAL GAS LIQUIDS
NITROGEN COMPOUNDS
NITROGEN HYDRIDES
NONMETALS
OILS
ORGANIC COMPOUNDS
OTHER ORGANIC COMPOUNDS
PETROLEUM PRODUCTS
PRODUCTION
SULFUR
010405* -- Coal
Lignite
& Peat-- Hydrogenation & Liquefaction
090320 -- Inorganic Hydrogen Compound Fuels-- Preparation-- (1976-1989)
10 SYNTHETIC FUELS
AMMONIA
BOILER FUEL
CAPITAL
COAL LIQUEFACTION PLANTS
COST
DESIGN
ELEMENTS
ENERGY SOURCES
ENGINEERING
FLUIDS
FUEL GAS
FUEL OILS
FUELS
GAS FUELS
GASES
HIGH BTU GAS
HYDRIDES
HYDROGEN COMPOUNDS
INDUSTRIAL PLANTS
LIQUEFIED PETROLEUM GASES
NATURAL GAS LIQUIDS
NITROGEN COMPOUNDS
NITROGEN HYDRIDES
NONMETALS
OILS
ORGANIC COMPOUNDS
OTHER ORGANIC COMPOUNDS
PETROLEUM PRODUCTS
PRODUCTION
SULFUR