Elmo Bumpy Torus proof of principle. Phase II - title 1 report. Volume I. Device summary
This document presents a summary of the EBT-P Preliminary Design (Title I) effort. The work was performed, under the direction of ORNL, for the Department of Energy by MDAC-St. Louis. Major subcontractors assisting MDAC included General Dynamics for the magnet system, Gilbert Associates for the device utilities and facility architecture and engineering, and Lockheed - Oak Ridge for engineering support services. The Title I period of performance was from 1 October 1980 to 1 March 1982.
- Research Organization:
- McDonnell Douglas Astronautics Co., St. Louis, MO (USA)
- DOE Contract Number:
- W-7405-ENG-26
- OSTI ID:
- 6691660
- Report Number(s):
- ORNL/Sub-81-21099/1-01; ON: DE83001326
- Country of Publication:
- United States
- Language:
- English
Similar Records
Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume V. Vacuum-pumping system. Preliminary design report
Elmo Bumpy Torus proof of principle. Phase II. Title 1 report. Volume III. Magnet system. Preliminary design report
Bottoms up design of the Elmo Bumpy Torus - proof of principal (EBT-P) fusion research facility
Technical Report
·
Thu Feb 25 23:00:00 EST 1982
·
OSTI ID:6704897
Elmo Bumpy Torus proof of principle. Phase II. Title 1 report. Volume III. Magnet system. Preliminary design report
Technical Report
·
Thu Feb 25 23:00:00 EST 1982
·
OSTI ID:6691440
Bottoms up design of the Elmo Bumpy Torus - proof of principal (EBT-P) fusion research facility
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Proc. Symp. Eng. Probl. Fusion Res.; (United States)
·
OSTI ID:6482479