Elmo Bumpy Torus proof of principle. Phase II. Title 1 report. Volume III. Magnet system. Preliminary design report
During Title I, General Dynamics' principal role as a subcontractor to the McDonnell Douglas Astronautics Company (MDAC) is to assist in the further development of a low-cost superconducting magnet mirror coil system for the EBT-P program consistent with long life and dependable operation. The activity can best be defined as an extension of ORNL's previous development program with further joint ORNL/MDAC/GDC refining of the mirror coil components. MDAC/GDC participation for the entire program can be subdivided into four distinct elements as follows: (1) design, development, and fabrication of two dewar subassemblies to enclose the ORNL developed and fabricated cold mass assemblies; (2) design, development, and fabrication of a production prototype magnet system including conductor (procurement), cold mass components, dewar and x-ray shield. This prototype would form the basis for the production of 36 magnets for the torus and three spares. (3) design, development, and fabrication of an electrical/electronic system including quench protection, instrumentation and control, and power supply to power and protect the mirror coil system during its operation in the torus; (4) fabrication of the 39 production magnets.
- Research Organization:
- McDonnell Douglas Astronautics Co., St. Louis, MO (USA)
- DOE Contract Number:
- W-7405-ENG-26
- OSTI ID:
- 6691440
- Report Number(s):
- ORNL/Sub-81-21099/1-03; ON: DE83002550
- Country of Publication:
- United States
- Language:
- English
Similar Records
Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume V. Vacuum-pumping system. Preliminary design report
ELMO Bumpy Square proposal
Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume IX. Support structure
Technical Report
·
Thu Feb 25 23:00:00 EST 1982
·
OSTI ID:6704897
ELMO Bumpy Square proposal
Technical Report
·
Wed Oct 01 00:00:00 EDT 1986
·
OSTI ID:7231423
Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume IX. Support structure
Technical Report
·
Thu Feb 25 23:00:00 EST 1982
·
OSTI ID:6691654
Related Subjects
70 PLASMA PHYSICS AND FUSION TECHNOLOGY
700202* -- Fusion Power Plant Technology-- Magnet Coils & Fields
CONTAINERS
CONTROL SYSTEMS
COOLING
DESIGN
DEWARS
ELECTRIC COILS
ELECTRICAL EQUIPMENT
ELMO BUMPY TORUS
ELMO DEVICES
EQUIPMENT
FABRICATION
MAGNET COILS
MAGNETIC MIRRORS
OPEN PLASMA DEVICES
REFRIGERATION
THERMONUCLEAR DEVICES
700202* -- Fusion Power Plant Technology-- Magnet Coils & Fields
CONTAINERS
CONTROL SYSTEMS
COOLING
DESIGN
DEWARS
ELECTRIC COILS
ELECTRICAL EQUIPMENT
ELMO BUMPY TORUS
ELMO DEVICES
EQUIPMENT
FABRICATION
MAGNET COILS
MAGNETIC MIRRORS
OPEN PLASMA DEVICES
REFRIGERATION
THERMONUCLEAR DEVICES