Title: Elmo Bumpy Torus proof of principle. Phase II. Title 1 report. Volume III. Magnet system. Preliminary design report

Technical Report ·
DOI:https://doi.org/10.2172/6691440· OSTI ID:6691440

During Title I, General Dynamics' principal role as a subcontractor to the McDonnell Douglas Astronautics Company (MDAC) is to assist in the further development of a low-cost superconducting magnet mirror coil system for the EBT-P program consistent with long life and dependable operation. The activity can best be defined as an extension of ORNL's previous development program with further joint ORNL/MDAC/GDC refining of the mirror coil components. MDAC/GDC participation for the entire program can be subdivided into four distinct elements as follows: (1) design, development, and fabrication of two dewar subassemblies to enclose the ORNL developed and fabricated cold mass assemblies; (2) design, development, and fabrication of a production prototype magnet system including conductor (procurement), cold mass components, dewar and x-ray shield. This prototype would form the basis for the production of 36 magnets for the torus and three spares. (3) design, development, and fabrication of an electrical/electronic system including quench protection, instrumentation and control, and power supply to power and protect the mirror coil system during its operation in the torus; (4) fabrication of the 39 production magnets.

Research Organization:
McDonnell Douglas Astronautics Co., St. Louis, MO (USA)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
6691440
Report Number(s):
ORNL/Sub-81-21099/1-03; ON: DE83002550
Resource Relation:
Other Information: Portions of document are illegible